–
Project:
MCE 485 Marina Coastal Expressway in Singapore
Client:
LTA - Land Transport Authority
Construction Period:
August 2009 - December 2011
Construction Company:
Penta Ocean Construction Co. Ltd.
Supplier:
VSL Singapore
The most expensive highway in Singapore connects the eastern and western parts of Singapore. With five lanes in each direction, this expressway has a length of 5 km, of which 3.5 km are constructed as a tunnel. SAS piles with prestressing tendons are used due to the soft soil layers (soft marine clay) at depths of up to approximately 57 meters. Temporarily, SAS piles are used for buoyancy safety (tension piles) and permanently as foundation piles (compression piles). With a total length of up to 70 meters, the SAS piles are quickly, easily, and securely coupled on-site using individual sections of 11.80 meters, with couplings and retaining nuts.
1,300 tons of prestressing steel SAS 950/1050 Ø 32 mm
with couplings and retaining nuts.
Wir setzen automatisiert nur technisch notwendige Cookies, deren Daten von uns nicht weitergegeben werden und ausschließlich zur Bereitstellung der Funktionalität dieser Seite dienen. Außerdem verwenden wir Cookies, die Ihr Verhalten beim Besuch der Webseiten messen, um das Interesse unserer Besucher besser kennen zu lernen. Wir erheben dabei nur pseudonyme Daten, eine Identifikation Ihrer Person erfolgt nicht. Weitere Informationen finden Sie in unserer Cookie-Richtlinie.