General Contractor:
Ed. Züblin AG
Client:
STRABAG Real Estate GmbH
The high-strength threaded steels SAS 670/800 were used for the cast-in-place concrete inner columns and precast edge columns of the high-rise building (building height approx. 90 m). The entire longitudinal reinforcement was uniformly executed in the high-strength threaded steel SAS 670/800.
For the cast-in-place columns, the reinforcement joints were made using contact couplers. The butt joint of the precast edge columns was grouted with high-strength mortar. The reinforcement ratio of the columns is a maximum of 13%. The large bar diameters, up to 57 mm, enable excellent reinforcement placement despite the high reinforcement ratio.
140 tons of threaded steel SAS 670/800 Ø 43 and 57 mm,
600 pcs. contact couplers
Wir setzen automatisiert nur technisch notwendige Cookies, deren Daten von uns nicht weitergegeben werden und ausschließlich zur Bereitstellung der Funktionalität dieser Seite dienen. Außerdem verwenden wir Cookies, die Ihr Verhalten beim Besuch der Webseiten messen, um das Interesse unserer Besucher besser kennen zu lernen. Wir erheben dabei nur pseudonyme Daten, eine Identifikation Ihrer Person erfolgt nicht. Weitere Informationen finden Sie in unserer Cookie-Richtlinie.