Project:
National Stadium in Warsaw, Poland
Architect:
JSK Architekci Sp. z o.o., GMP International GmbH, SBP GmbH
Construction Period:
2011 - 2012
Construction Company:
PBG S.A., Alpine Bau GmbH
Supplier:
ATM Sp. z o.o.
Following the idea of a lightweight and transparent structure, the SAS prestressing systems anchor the vertical loads from the steel guy wires and the roof structure into the foundation blocks.
Opened on January 29, 2012, the National Stadium in Warsaw hosted a total of five matches of the UEFA Euro 2012, including the opening match.
ATM Sp. z o.o., as a specialist company qualified by SAH in Poland, supplied, installed, and prestressed 692 pieces of SAS 950/1050 Ø 40 prestressing tendons without bond, in accordance with the European Technical Approval ETA-05/0122.
Wir setzen automatisiert nur technisch notwendige Cookies, deren Daten von uns nicht weitergegeben werden und ausschließlich zur Bereitstellung der Funktionalität dieser Seite dienen. Außerdem verwenden wir Cookies, die Ihr Verhalten beim Besuch der Webseiten messen, um das Interesse unserer Besucher besser kennen zu lernen. Wir erheben dabei nur pseudonyme Daten, eine Identifikation Ihrer Person erfolgt nicht. Weitere Informationen finden Sie in unserer Cookie-Richtlinie.