Laguna Bridge

Pinheiros River, Brasil
2015

2016

Client:
Ulma Formas E Escoramentos Ltda.

 

Construction Period:
January 2015 - March 2016

 

Construction Company:
Odebrecht Infrastrutura / SPObras

 

Supplier:
SAS Protensão

Application:

The Laguna Bridge consists of a 1000-meter bridge structure, of which 105 meters span over the Pinheiros River. Through an alternative construction method using precast elements, two temporary piers in the riverbed were eliminated, saving 30% of the construction costs. The lateral approach bridges were built on falsework over live traffic. The SAS prestressing bar system was used to support the weight of the formwork and temporary steel structures.

Scope of delivery:

SAS 900/1050 Formwork Anchor FC 15, Ø 15 mm and SAS 950/1050 Prestressing Steel, Ø 26.5, 32, and 36 mm.