–
Project:
Julianahaven in Eemshaven, Netherlands
Construction of a permanent anchoring structure for the port facility
Client:
N. Kraaijeveld B.V.
Construction time:
October 2006 - January 2007
Construction company:
BAUER Funderingstechnieken BV, Mijdrecht, Netherlands
Due to use in a highly corrosive environment, durability against corrosion is ensured by utilizing a double-corrosion-protected system. The SAS threaded rod is pre-injected with cement grout inside a ribbed sheath. This allows the SAS system to be used for permanent applications even under tensile loads.
540 pcs. threaded rods SAS 670/800 Ø 75 mm with a total weight of 370 tons,
1,080 pcs. of corresponding accessories such as anchor nuts, lock nuts, and coupler connections.
Wir setzen automatisiert nur technisch notwendige Cookies, deren Daten von uns nicht weitergegeben werden und ausschließlich zur Bereitstellung der Funktionalität dieser Seite dienen. Außerdem verwenden wir Cookies, die Ihr Verhalten beim Besuch der Webseiten messen, um das Interesse unserer Besucher besser kennen zu lernen. Wir erheben dabei nur pseudonyme Daten, eine Identifikation Ihrer Person erfolgt nicht. Weitere Informationen finden Sie in unserer Cookie-Richtlinie.