Julianahaven in Eemshaven, Netherlands
Construction of a permanent anchoring structure for the port facility

 

Client:
N. Kraaijeveld B.V.

 

Construction time:
October 2006 - January 2007

 

Construction company:
BAUER Funderingstechnieken BV, Mijdrecht, Netherlands

Application:

Due to use in a highly corrosive environment, durability against corrosion is ensured by utilizing a double-corrosion-protected system. The SAS threaded rod is pre-injected with cement grout inside a ribbed sheath. This allows the SAS system to be used for permanent applications even under tensile loads.

Scope of delivery:

540 pcs. threaded rods SAS 670/800 Ø 75 mm with a total weight of 370 tons,