Client:
QML - Queensland Motorway Limited
Construction time:
September 2006 - May 2010
Construction company:
Leighton Abigroup Joint Venture
Supplier:
VSL Australia Pty. Ltd.
The new Gateway Bridge stands on reinforced concrete piers with dimensions of 15 m in length and 2.5 m in width. The loads from the reinforced concrete piers are transferred to pile cap foundations with an area of 19.5 m in length, 17.6 m in width, and a thickness of 3.2 m. These loads are distributed into the load-bearing ground through piles with a diameter of 1.8 m. The pile caps are reinforced with SAS 835/1035 tension rods Ø 75 mm to provide horizontal and vertical prestressing in the main pile caps.
150 SAS 835/1035 tension rods Ø 75 mm for the foundation of the bridge piers,
SAS couplers are used for the rigid connection of the SAS tension rods.
Wir setzen automatisiert nur technisch notwendige Cookies, deren Daten von uns nicht weitergegeben werden und ausschließlich zur Bereitstellung der Funktionalität dieser Seite dienen. Außerdem verwenden wir Cookies, die Ihr Verhalten beim Besuch der Webseiten messen, um das Interesse unserer Besucher besser kennen zu lernen. Wir erheben dabei nur pseudonyme Daten, eine Identifikation Ihrer Person erfolgt nicht. Weitere Informationen finden Sie in unserer Cookie-Richtlinie.