Client:
China Three Gorges Corporation
Construction Period:
2010 - 2014
Construction Company:
China Gezhouba Group Corporation
Supplier:
SAS Asia Bar Systems
A vertical ship lift allows ships to pass through the Three Gorges Dam on the Yangtze River. The largest ship chamber is 132 meters long, 23 meters wide, has a depth of 3.5 meters, and a capacity of 3,000 tons. The total weight that can be lifted is 34,000 tons, with a lifting height of 113 meters. A driven screw spindle runs in a steel shaft, lifting the enormous weight and providing a secure stop system in exceptional cases. This steel shaft is fixed to the structural concrete with SAS prestressing tendons, which absorb and transfer the extreme loads. The on-site instruction and monitoring during the installation were provided by Stahlwerk Annahütte.
708 Prestressing Tendons, Smooth Bar SAS 950/1050 Ø 36 mm, both ends with rolled special thread; Tendons without bond, complete systems consisting of rods, plates, nuts (special anchor nuts and project-specific corrosion protection caps).
Wir setzen automatisiert nur technisch notwendige Cookies, deren Daten von uns nicht weitergegeben werden und ausschließlich zur Bereitstellung der Funktionalität dieser Seite dienen. Außerdem verwenden wir Cookies, die Ihr Verhalten beim Besuch der Webseiten messen, um das Interesse unserer Besucher besser kennen zu lernen. Wir erheben dabei nur pseudonyme Daten, eine Identifikation Ihrer Person erfolgt nicht. Weitere Informationen finden Sie in unserer Cookie-Richtlinie.