Logo Sah
deenes
  • Company
    • Business sectors
    • Company mission statement
    • History
    • Environment
    • Managing Director
    • SAH worldwide
    • Max Aicher Group
  • Quality
    • Quality assurances
    • Testing methods
    • Quality Management
  • Products
    • Steel production
    • SAH steel bars
    • SAS thread bar systems
  • Reference Projects
  • Downloads
    • Technical Documents
    • Catalogues and brochures
    • Approvals
    • Certificates
    • Reference projects
    • Externial companies ordinance
    • Supplier Code of Conduct
    • Sustainability Report
  • Career
    • Talent pool
    • Training and development
  • Contact
  1. Home
  2. Reference Projects
  3. Laguna Bridge

Laguna Bridge, Pinheiros River, Brasil

POST-TENSIONING SYSTEMS

 

Project:
Laguna Bridge, Pinheiros River, Brasil

 

Client:
Ulma Formas E Escoramentos Ltda.

 

Construction period:
January 2015 - March 2016

 

Construction company:
Odebrecht Infrastrutura / SPObras

 

Supplier:
SAS Protensão

 

Scope of supply:
SAS 900/1050 formwork ties FC 15, diameter 15 mm and SAS 950/105 post-tensioning thread bar, diameter 26.5, 32 and 36 mm.

 

Application:    
Laguna Bridge consist of 1000 meters elevated road, including 105 meters over the Pinheiros river. The conforming project design had 2 temporary columns in the river. The redesign to construct the bridge with cantilever method saved 30% of the budget. The road beside the river was constructed over running traffic. The solution was to use scaffolding systems to construct the bridge over the 4 lanes of road. The SAS thread bar system was used to tie down and secure the weight of the scaffolding system and temporary steel structures.

Laguna Bridge 1Laguna Bridge 7
Laguna Bridge 1
Laguna Bridge 7