Logo Sah
deenes
  • Company
    • Business sectors
    • Company mission statement
    • History
    • Environment
    • Managing Director
    • SAH worldwide
    • Max Aicher Group
  • Quality
    • Quality assurances
    • Testing methods
    • Quality Management
  • Products
    • Steel production
    • SAH steel bars
    • SAS thread bar systems
  • Reference Projects
  • Downloads
    • Technical Documents
    • Catalogues and brochures
    • Approvals
    • Certificates
    • Reference projects
    • Externial companies ordinance
    • Supplier Code of Conduct
    • Sustainability Report
  • Career
    • Talent pool
    • Training and development
  • Contact
  1. Home
  2. Reference Projects
  3. ITER - International Thermonuclear Experimental Reactor

ITER, Saint-Paul-lés-Durance, Southern France

REINFORCING COUPLING SYSTEMS

 

Project:
ITER - International Thermonuclear Experimental Reactor
in Saint-Paul-lés-Durance, southern France

 

Construction Period:
2015 - 2025 (expected)

 

Client: Groupement VFR :
VINCI Construction / FERROVIAL / RAZEL BEC

 

Main constructor:
ITER ORGANIZATION

 

Scope of supply:
SAS 500 / 550-50 length 6900 mm 360 pieces
SAS 500 / 550-50 length 6000 mm 40 pieces
SAS 500 / 550-40 length 5800 mm 32 pieces
SAS 500 / 550-40 length 6670 mm 288 pieces
T2163 / 50 920 pieces
T2163 / 40 234 pieces

 

Supplier:
AdC - Accessoires de Construction

 

Application:
ITER will be the first fusion facility. The tokamak is an experimental machine designed to harness the energy of fusion. ITER will be the world‘s largest tokamak. One-meter thick radial walls will connect the massive ITER bioshield to the concrete tokamak crown, which will support the combined mass of the cryostat, the vacuum vessel, the magnet system and the thermal shield. The spokes are reinforced with numbers of SAS 500 bars.

 

Iter Dji 0256Iter Dji 0317Iter Dsc03943
Iter Dji 0256
Iter Dji 0317
Iter Dsc03943
© Stahlwerk Annahütte Max Aicher GmbH & Co. KG
  • Imprint
  • Terms and conditions
  • Data privacy