Logo Sah
deenes
  • Company
    • Business sectors
    • Company mission statement
    • History
    • Environment
    • Managing Director
    • SAH worldwide
    • Max Aicher Group
  • Quality
    • Quality assurances
    • Testing methods
    • Quality Management
  • Products
    • Steel production
    • SAH steel bars
    • SAS thread bar systems
  • Reference Projects
  • Downloads
    • Technical Documents
    • Catalogues and brochures
    • Approvals
    • Certificates
    • Reference projects
    • Externial companies ordinance
    • Supplier Code of Conduct
    • Sustainability Report
  • Career
    • Talent pool
    • Training and development
  • Contact
  1. Home
  2. Reference Projects
  3. Express Way

Expressway, Singapore

GEOTECHNICAL SYSTEMS

 

Project:    
MCE 485 Marina Coastal Expressway in Singapore

 

Client:     
LTA - Land Transport Authorithy

 

Construction period:    
August 2009 - December 2011

 

Construction company:
Penta Ocean Construction Co. Ltd.

 

Supplier:
VSL Singapore

 

Scope of supply:
1,300 tons post-tensioning bars SAS 950/1050 Ø 32 mm,  with couplers and fix nuts
    
 

Application:    
It is the most expensive expressway of Singapore and it is the traffic connection between the east and west part of Singapore. With five lanes for each direction, the expressway has a total length of 5 km, where of 3.5 km are realized as a tunnel. SAS piles with post-tensioning bars are used because of the existing soft soil layers (soft marine clay) up to a depth of ~57 m. SAS piles are used temporary for the negative buoyancy (tensile) and permanent as foundation piles (compression). With a total length of 70 m SAS piles are connected fast, easy and safe with couplers and fix nuts based on single bar sections with lengths of 11.8 m.