Logo Sah
deenes
  • Company
    • SAH worldwide
    • Business sectors
    • The steel boutique
    • Company mission statement
    • Brand
    • History
    • Environment
    • Managing Director
    • Max Aicher Group
  • Quality
    • Quality assurances
    • Testing methods
    • Quality Management
  • Products
    • SAH steel bars
    • SAS thread bar systems
    • Steel production
  • Reference Projects
    • SAS Systems Projects
  • Downloads
    • Technical Documents
    • Catalogues and brochures
    • Approvals
    • Certificates
    • Reference projects
    • Externial companies ordinance
  • Career
    • Talent pool
    • Training and development
  • Contact
  1. Home
  2. Reference Projects
  3. SAS Systems Projects
  4. Nuclear power plant,

Nuclear power plant, Gösgen, Switzerland

REINFORCING COUPLING SYSTEMS

 

Project:    
Nuclear power plant in Gösgen, Switzerland, expansion of storage capacity for spent fuel assemblies. 
Capacity for 1,000 fuel assemblies; designed to withstand airplane crash and earthquake

 

Client:     
Kernkraftwerk Gösgen-Däniken AG

 

Construction period:    
October 2004 - February 2008

 

Main contractor:
AREVA NP GmbH

 

Construction company:
Implenia Bau AG

 

Scope of supply:
1,340 tons thread bars SAS 500/550 Ø 12 - 32 mm with accessories for end anchorages, coupling and 
turnbuckle splices. SAS thread bars and accessories are delivered bended and preassembled according 
to structural design requirements

 

Application:    
The thread bars SAS 500/550 are used as reinforcement in the outer shell and in the fuel pool of the spent fuel storage facility. The easy installation and the coarse thread bars SAS 500/550 compensate the high 
percentage of reinforcing bars in that project. The SAS couplers ensure an easy and place saving installation of the thread bars SAS 500/550 between the individual sections.
 

2007 09 20 Kkw Goesgen Dachdecke03 Bearbeitet2006 08 23 Rs Kkw Goesgen Rm30 Klein Neu2006 08 25 Rs Kkw Goesgen Rm08 BearbeitetFlugaufnahme Bearbeitet
2007 09 20 Kkw Goesgen Dachdecke03 Bearbeitet
2006 08 23 Rs Kkw Goesgen Rm30 Klein Neu
2006 08 25 Rs Kkw Goesgen Rm08 Bearbeitet
Flugaufnahme Bearbeitet
© Stahlwerk Annahütte Max Aicher GmbH & Co. KG
  • Imprint
  • Terms and conditions
  • Data privacy