Logo Sah
deenes
  • Company
    • SAH worldwide
    • Business sectors
    • The steel boutique
    • Company mission statement
    • Brand
    • History
    • Environment
    • Managing Director
    • Max Aicher Group
  • Quality
    • Quality assurances
    • Testing methods
    • Quality Management
  • Products
    • SAH steel bars
    • SAS thread bar systems
    • Steel production
  • Reference Projects
    • SAS Systems Projects
  • Downloads
    • Technical Documents
    • Catalogues and brochures
    • Approvals
    • Certificates
    • Reference projects
    • Externial companies ordinance
  • Career
    • Talent pool
    • Training and development
  • Contact
  1. Home
  2. Reference Projects
  3. SAS Systems Projects
  4. Musi Vl Bridge

Musi IV Bridge, Palembang, Indonesia

POST-TENSIONING SYSTEMS

 

Project:
Musi IV Bridge, Palembang, Indonesia

 

Construction Period:
March 2016 to December 2018

 

Client:
Directorate General Bina Marga
Minister of Public Works & Housing Republic Indonesia

 

Main contractor:
PT Adhi Karya (Persero) TBK

 

Sub contractor:
PT Delta Systech Indonesia

 

Supplier:
SAS Asia Bar Systems Pte. Ltd.

 

Scope of supply:
65 tons of SAS 950 / 1050 Ø 32 mm and SAS 835 / 1035 Ø 57 mm and accessories

 

Application:
The Musi IV Bridge, connecting both sides of the Musi River in Palembang city, South Sumatra, is a much anticipated addition to the city where severe traffic congestion can occur often during rush hours. Spanning 12 meters wide and 1,130 meters long, the Musi IV Bridge is designed for a durability of up to 100 years as well as earthquake resistant. The main span of the bridge was constructed by using the extradosed method that combined the main elements of prestressed box girder and a stayed-cable bridge. This bridge design uses tendons outside the cross-section envelope. SAS Asia supplied the SAS 950 / 1050 as well as SAS 835 / 1035 PT bars to PT Delta Systech Indonesia for the post tensioning works of the pylons and form traveler parts.

Pt15 Musi Iv Bridge Palembang Idn 03Pt15 Musi Iv Bridge Palembang Idn 01 1
Pt15 Musi Iv Bridge Palembang Idn 03
Pt15 Musi Iv Bridge Palembang Idn 01 1
© Stahlwerk Annahütte Max Aicher GmbH & Co. KG
  • Imprint
  • Terms and conditions
  • Data privacy