Peñón de Cortijo, Bogota, Colombia

GEOTECHNICAL SYSTEMS

 

Project:
Peñón de Cortijo, Bogota, Colombia

 

Client:
Alcaldía Local Ciudad Bolivar

 

Construction period:
April 2015 - December 2015

 

Construction company:
Jeinco

 

Supplier:
Warco

 

Scope of supply:
48 ton of SAS 500 (grade 75)  diameter 32 mm thread bars, coupled in length of 4 meter.

 

Application:    
The project is located in the south of Bogota (Colombia), it consists of a slope stabilization. The lower part of the slope had suffered from rock fall and the houses were suffering from cracks. It was decided to secure the slope with the system SPIDER from Geobrugg geotextile, tied down with SAS500 bars in diameter 32 mm. The pattern selected was 3,0 x 3,0 m in the whole slope and the working load was between 3-5 tons.

Cookie settings

We automatically set only technically necessary cookies the data of which we do not pass on and use exclusively for providing the functionality of this site.

We also use cookies which monitor your behaviour when visiting the web sites to get know the interests of our visitors better. We only collect pseudonym data; we do not identify your person.

Further information can be found in our privacy policy.