Frankfurt Operatower, Germany
REINFORCING COUPLING SYSTEMS
Project:
Scyscraper Operatower in Frankfurt, Germany
Client:
Opernplatz Property Holdings GmbH & Co. KG
Construction period:
January 2007 - December 2009
Main contractor:
Ed. Züblin AG
Owner:
Tishman Speyer
Scope of supply:
320 tons thread bars SAS 670/800 Ø 30 - 75 mm,
3,700 pcs. contact couplers
Application:
The high-strength thread bars SAS 670/800 and contact couplers are used for reinforcing the columns of a high-rise building (total height of the building ~170 m) in Germany for the first time. The total longitudinal reinforcement of the high load capacity and edge columns is designed with the high-strength thread bars SAS 670/800. The ratio of reinforcement is up to 13 %. This high ratio of reinforcement at no congestion of steel in the columns is possible due to the rebar diameter of up to 75 mm. Mechanical splices of SAS thread bars by contact couplers allow the transferring of high compressive forces.